Please be aware, there will be construction taking place in the parking lot over the next several days. The landlord has issued the following letter:

Please be informed that Sierra Nevada Construction has been contracted to repair and slurry seal the parking lots of Sparks Business Center. The repairs are scheduled to begin on Sunday, September 16th, 2018 at 6:30 a.m.
Below is the schedule for repairs and slurry seal.

  • Sunday, September 16th – Crack Sealing will be done throughout the parking lot of all four buildings (605 Boxington Way, 755 Lillard Way, 1625 & 1675 E. Prater Way).

  • Tuesday, September 18th – Starting at 6:30 a.m., Asphalt Patching on five locations marked in blue as shown on the map attached. Traffic will be allowed as Sierra Nevada Construction will direct people to available parking areas. Detour signage will be placed by the entrance to direct traffic to enter the building through Lillard Drive.

  • Saturday, September 29th – Starting at 6:30 a.m., 1625, and 1675 E. Prater Way will be slurry sealed. Both buildings will be closed for the day while the product dries. All trucks, equipment, trailers, and dumpsters must be removed from the pavement surfaces on these two buildings for the slurry seal.  Items can be placed temporarily on the Lillard and Boxington lots. 

  • Sunday, September 30th – All four buildings will be striped.          